EV Charging in an Apartment Building: Rights, Costs, Technology

Charging an EV in an apartment building in Germany: rights under Section 554 BGB and Section 20 WEG, who pays, which technology can handle it and why a household socket is no solution.

handgetestet editorial team · Updated November 17, 2026
Contents13 sections

This guide was first published in German on handgetestet.de.

The household socket in the underground garage is not a way to charge but a dispute waiting to happen. If you want to charge in an apartment building, you need permission or a resolution, a licensed electrical contractor and ideally load management for the whole building. In Germany, tenants and owners have a legal right to this, but as a rule they bear the costs themselves. As a charging point for shared installations, we consider the KEBA KeContact P40 Pro the most sensible choice, because a calibrated meter, RFID and a residual current device are already built in.

Why the existing socket is no solution

The German National Center for Charging Infrastructure (Nationale Leitstelle Ladeinfrastruktur) puts it bluntly in its guideline for multi-unit buildings: existing sockets in the garage should generally not be used for charging; only professionally installed and regularly maintained charging infrastructure should be.

The reason is the continuous load. According to the ADAC, the German automobile club, household (Schuko) sockets can only handle 16 amps for a limited time, and during several hours of charging, aged contacts and terminals can overheat. The Verbraucherzentrale, the German consumer advice center, warns of overloaded wiring and, in the worst case, fires. Nobody wants to try that out in an underground garage. Then there is the money: if the socket is on the building’s common electricity supply, all households pay for your driving. Without a meter, this cannot be separated cleanly. A granny charger or a portable wallbox does not change any of that as long as the wiring behind it stays the same.

Tenants: what Section 554 BGB does and does not give you

Under Section 554 of the German Civil Code (BGB), you can demand that your landlord permit structural changes that serve charging. This right cannot be bargained away to your disadvantage in the rental agreement. It is excluded only if the work cannot reasonably be expected of the landlord, and that is weighed case by case. According to the guideline, a blanket refusal is not possible.

There are three limitations you should know. The right applies in any case to the parking space assigned to you; it does not get you a space. It is a right to permission, not a right to go ahead: as a rule, nobody may install a wallbox without consent. And when you move out, you generally have to remove it, for which the landlord can agree on a special security deposit.

If the apartment belongs to a member of a condominium owners‘ association, that association usually has to pass a resolution first. Your landlord then has to put the matter on the agenda of the owners‘ meeting. If the landlord does nothing, that counts in your favor in the weighing. If the landlord builds the installation, this is usually a modernization that must be announced at least three months in advance and can be partly passed on to the rent under Section 559 BGB.

Owners: who decides under Section 20 WEG, who pays under Section 21?

Under the German Condominium Act (WEG), every apartment owner can demand reasonable structural changes for charging. That concerns the whether. The association decides on the how, meaning the contractor and the cable routing. According to the guideline, excessive conditions that effectively block the project are not permitted; if necessary, a court action to substitute the resolution helps. Even with your own parking space: walls, wiring and the building’s grid connection are common property. Without a resolution, no drilling.

The costs follow the route taken:

  • A single owner demands it: that owner pays alone and uses it alone (Section 21 (1) WEG).
  • Resolution with more than two-thirds of the votes cast and half of the co-ownership shares: everyone pays according to their shares, provided the costs are not disproportionate.
  • Simple majority: those who voted yes pay, and only they use the installation.

Anyone who joins later can use it in return for reasonable compensation (Section 21 (4) WEG). Our view: whoever pushes ahead alone pays the most and may end up blocking capacity for the neighbors. Ask around first. The center’s WEGweiser guide describes the process in eight steps, from surveying demand to maintenance.

Is there still funding?

Hardly any from the German federal government at present. The program from April 2026 funded charging points and pre-wiring in existing buildings with three or more apartments, and it was quickly exhausted. For condominium owners‘ associations, the call ended early on November 2, 2026, due to high demand, one week before the planned end. According to the program page, small and medium-sized companies and private owners of multi-unit buildings could submit applications until November 10, 2026 at the latest, while funds lasted (as of November 9, 2026). Whether another call will follow is posted on the program page. Individual German states and municipalities pay their own grants. For all programs: approval first, then the contract.

Which technology can handle a whole building?

Without control, the grid connection would have to carry all chargers at once. 25 parking spaces at 11 kW would be 275 kW. With load management, the guideline assumes a simultaneity factor of 0.1 to 0.3, so at 0.2 that is still 55 kW. Static load management distributes a fixed maximum, while dynamic load management measures at the grid connection and releases whatever the building does not need at that moment. If the total power exceeds 12 kVA, the grid operator must approve it in advance under Section 19 of the German Low Voltage Connection Ordinance (NAV). Every charging device has to be registered. A load profile measurement shows whether the connection is sufficient. The guideline also recommends consulting the local fire department, even though, according to current knowledge, electric cars pose no greater fire risk than combustion cars.

For the electricity, there are three routes. Behind your apartment’s meter, you are billed directly by your own supplier, but you need a permanently assigned space, room in the meter cabinet and often long cable runs. That works for individual parking spaces. On the common electricity meter, it is inexpensive and expandable; costs are then allocated via MID meters and the property management or a service provider, and there is no free choice of supplier. A separate meter for all charging points costs more but cleanly separates charging from building electricity. In any case, look for open protocols such as OCPP, Modbus or EEBUS; otherwise the installation is tied to one manufacturer. The basics of power and features are in our guide to buying a wallbox, and grid fees are covered in the article Electricity for heat pump and wallbox (in German).

Five building blocks for the garage

ModelLoad management according to manufacturerBilling and accessBest for
KEBA KeContact P40 Proup to 200 chargers with M20 controllercalibrated meter (MID, MessEV), RFID, OCPPShared installation
Heidelberg Wallbox Energy Control Plusstatic, up to 16 chargers without controllerModbus RTU, external enableSmall group
go-e Charger Gemini 2.0 11 kWstatic, dynamic with go-e ControllerRFID, OCPP, electricity meterSingle space on the apartment meter
Mennekes 36247cable, no controlMode 3, 7.5 m, up to 22 kWChargers with Type 2 socket
EVDANCE Type 2 charging cable, 3-phase, 16 Acable, no control11 kW according to supplier, 6 or 10 mChargers with Type 2 socket, after checking the documentation

KEBA KeContact P40 Pro

It suits a shared installation because KEBA builds in the calibrated meter that billing through a service provider requires (compliant with MID and the German Measurement and Verification Ordinance, MessEV). According to the manufacturer, a Type A residual current device with DC fault current detection is integrated and resets itself after tripping. With the M20 controller, up to 200 chargers can be connected, with Wi-Fi, Ethernet and optional LTE to choose from. A version with a Type 2 socket is available for changing users. For a single parking space, it is more device than you would need.

Heidelberg Wallbox Energy Control Plus

According to the data sheet, up to 16 chargers share the power without an additional controller. The load management is static, but easy to understand. For billing, the contractor should plan separate meters. For a small group on a shared meter, it is a sober candidate.

go-e Charger Gemini 2.0 11 kW

Cellular connectivity is built in, which is an advantage in underground garages without Wi-Fi, provided there is reception. RFID protects against charging by others and separates electricity by user. In the distribution board, a Type A residual current device and a circuit breaker are needed in addition. Dynamic load management requires the go-e Controller at extra cost. We see this charger at a single space behind the apartment’s meter. On Amazon, the Gemini 2.0 is currently unavailable (as of November 9, 2026).

Mennekes 36247

If your charger has a socket instead of a tethered cable, you need your own charging cable. The 36247 is three-phase, 7.5 meters long and rated IP44. It weighs 4.43 kilograms, which does not matter at the parking space.

EVDANCE Type 2 charging cable, 3-phase, 16 A

From EVDANCE, only the cable is an option here, which according to the supplier transfers 11 kW; to our knowledge, the brand does not offer a fixed wallbox for Germany. You should look at the manual and test marks before buying, because the ADAC advises checking the manufacturer’s address on the rating plate and the declaration of conformity for lesser-known brands. The same supplier’s portable wallbox is no alternative for a shared garage, because the supplier does not mention integration into the building’s load management.

How to proceed

  • You rent: write to your landlord, cite Section 554 BGB and your parking space, enclose a quote and offer a security deposit for removal.
  • You are an owner and on your own: submit a motion for the next owners‘ meeting, go-e Charger Gemini 2.0 behind your apartment’s meter, provided wiring and meter cabinet allow it.
  • Several people in the building want to charge: survey demand, an overall concept with load management, then the KEBA KeContact P40 Pro.
  • Small group of up to 16 spaces without a billing service: Heidelberg Wallbox Energy Control Plus with its own metering concept.

This overview is no substitute for legal advice. Resolutions should be reviewed by experts.

The rules for an individual charger are in the guide Retrofitting a wallbox: registration and Section 14a (in German).

Frequently asked questions

Can I charge my EV from the socket in the underground garage?

The German National Center for Charging Infrastructure advises against it. According to the ADAC, household (Schuko) sockets can only handle 16 amps for a limited time, and aged contacts can overheat during hours of charging. If the socket is on the building's common electricity supply, all households also end up paying for your driving.

Does my landlord have to allow a wallbox?

Under Section 554 of the German Civil Code (BGB), you can demand that the landlord permit structural changes for charging; a blanket refusal is not possible. The right applies to your assigned parking space. You may not install anything without consent, and when you move out you generally have to remove it.

Who pays for the charging station in a condominium owners' association?

If one owner demands it alone, that owner pays and uses it alone. If the association decides with more than two-thirds of the votes and half of the ownership shares, everyone pays according to their shares. With a simple majority, only those who voted yes pay. Owners who join later can use it in return for compensation.

Why does an apartment building need load management?

Without control, the grid connection would have to carry all chargers at once; with 25 parking spaces at 11 kW, that would be 275 kW. With load management, the guideline calculates with considerably less. Dynamic load management measures at the grid connection and releases whatever the building does not need at that moment.

Is there still funding for charging stations in apartment buildings?

Hardly any from the German federal government at present. The call for condominium owners' associations ended on November 2, 2026. According to the program page, small and medium-sized companies and private owners could apply until November 10, 2026 at the latest (as of November 9, 2026). Individual German states and municipalities pay their own grants.

How do I bill charging electricity in an apartment building?

Behind your apartment's meter, you are billed directly by your own supplier, which works for individual spaces. On the common electricity supply, costs are allocated via MID meters and the property management. A separate meter for all charging points cleanly separates charging from building electricity. Look for open protocols such as OCPP.

Sources

Where to buy

Shop in:

Sale, delivery, warranty and product safety are the sole responsibility of the respective retailer and manufacturer. All information without guarantee; prices and availability may change.

Links marked as affiliate links earn us a small commission if you buy through them. The price stays the same for you, and our verdict stays independent. As an Amazon Associate we earn from qualifying purchases.